Volume 1 Cover
Cover Sheet
Table of Contents
Notation
Summary
Chapter 1 Introduction
Chapter 2 Description and Comparison of Alternatives
Chapter 3 Affected Environment
Chapter 4 Environmental Impact Assessment Approach, Assumptions, and Methodology
Chapter 5 Environmental Impacts of Alternatives
Chapter 6 Environmental and Occupational Safety and Health Permits and Compliance Requirements
Chapter 7 References
Chapter 8 List of Preparers
Chapter 9 Glossary
Chapter 10 Index
Volume 2
Volume II Cover
Cover Sheet
Table of Contents
Notation
Chapter 1 Public Review of the Draft Environmental Impact Statements
Chapter 2 Comment Documents
Chapter 2 Comment Documents Cont'
Chapter 2 Comment Documents Cont'
Chapter 2 Comment Documents Cont'
Chapter 3 Responses to Comments
Chapter 4 References
Appendices
Appendix A Text of Public Law 107-206 Pertinent to the Management of DUF6
Appendix B Issues Associated with DUF6 Cylinder Contamination
Appendix C Scoping Summary Report for Depleted Uranium Hexafluoride Conversion Facilities Environmental Impact Statement Scoping Process
Appendix D Environmental Synopsis for the Depleted UF6 Conversion Project
Appendix E Impacts Associated with HF and CaF2 Conversion Product Sale and Use
Appendix F Assessment Methodologies
Appendix G Consultation Letters
Appendix G Consultation Letters con't
Appendix G Consultation Letters con't
Appendix G Consultation Letters / Response to Letters
Appendix G Response to Letters con't
Appendix G Response to Letters con't
Appendix H Contractor Disclosure Statement
Figures and Tables
Figure S-1 Regional Map of the Portsmouth, Ohio, Site Vicinity
Figure S-3 Three Alternative Conversion Facility Location within the Portsmouth Site
Figure S-4 Conceptual Overall Material Flow Diagram for the Portsmouth Conversation Facility
Figure S-5 Conceptual Conversion Facility Site Layout for Portsmouth
Figure S-6 Potential Locations for Construction of a New Cylinder Storage Yard at Portsmouth
Figure S-7 Areas of Potential Impact Evaluated for Each Alternative
Figure 2.2-1 Three Alternative Conversion Facility Locations withing the Portsmouth Site
Figure 2.2-2 Conceptual Overall Materials Flow Diagram for the Portsmouth Conversion Facility
Figure 2.2-3 Conceptual Conversion Facility Site Layout for Portsmouth
Figure 2.4-1 Potential Locations for Construction of a New Cylinder Storage Yard at Portsmouth
Figure 3.1-1 Regional Map of the Portsmouth Site Vicinity
Figure 3.1-2 Locations of Cylinder Yards at the Portsmouth Site That Are Used to Store DOE-Managed Cylinders
Figure 3.1-4 Portsmouth Site Drainage Features
Figure 3.1-5 Wetlands in the Vicinity of the Three Candidate Locations for the Portsmouth Conversion Facility
Figure 3.1-6 Land Cover in Pike County, Ohio
Figure 3.1-7 Census Tracts within 50 mi of the Conversion Facility at the Portsmouth Site with Minority Populations
Figure 3.1-8 Census Tracts within 50 mi of the Conversion Facility at the Portsmouth Site with Low-Income Populations
Figure 3.2-3 Wind Rose for the ETTP K1209 Meteorological Tower
Figure 3.2-5 Land Cover in Roane County, Tennessee
Figure 3.2-6 Census Tracts within 50 mi of the Storage Facility at ETTP with Minority Populations
Figure 3.2-7 Census Tracts within 50 mi of the Storage Facility at ETTP with Low-Income Populations
Table S-2 Summary of Alternatives Considered for the Portsmouth Conversion Facility EIS
Table S-5 Summary of Major EIS Data and Assumption
Table S-6 Summary Comparison of Potential Environmental Consequences
Table 2.4-1 Summary Comparison of Potential Environmental Consequences of the Alternatives
Table 3.1-3 National Ambient Air Quality Standards, Ohio State Ambient Air Quality Standards
Table 3.1-5 Estimated Radiation Doses to Members of General Public
Table 3.1-6 Estimated Hazard Quotients for Members of the General Public
Table 3.2-3 National Ambient Air Quality Standards, Tennessee State Ambient Air Quality Standards
Table 3.2-6 Federal- and State-Listed Endangered, Threatened, and Special Concern Species
Table 3.2-7 Estimated Radiation Doses to Members of the General Public and Cylinder Yard Workers
Table 3.2-8 Estimated Hazard Quotients for Members of the Public near ETTP