| |
|
|
|
BY
DOE EA NUMBER
|
 |
DOE/EA-1113-A |
Environmental
Assessment Addendum For the Proposed Title Transfer
|
 |
DOE/EA-1175-A |
Environmental
Assessment Addendum for the Proposed Title Transfer
of East Tennessee Technology Park Land and Facilities
(July 2003)
|
 |
DOE/EA-1269 |
Environmental
Assessment for Decontamination and Volume Reduction
System at the Los Alamos National Laboratory (June
1999)
|
 |
DOE/EA-1282-SA-03 |
Supplement
Analysis for the Mid-Columbia Coho Reintroduction Feasibility
Project EA (November 2002)
|
 |
DOE/EA-1301 |
Final
Environmental Assessment - Idaho Department of Fish
and Game Captive Rearing Initiative for Salmon River
Chinook Salmon (October 2000)
|
 |
DOE/EA-1313 |
Environmental
Assessment of Ground Water Compliance at the Monument
Valley Arizona, Uranium Mill Tailings Site (March 2005)
|
 |
DOE/EA-1339A |
Environmental
Assessment Addendum Disposition of Additional Waste
at the Paducah Site Paducah, Kentucky (December 2003)
|
 |
DOE/EA-1345 |
Environmental
Assessment for Cleanup and Closure of the Energy Technology
Engineering Center (March 2003)
|
 |
DOE/EA-1354 |
Environmental
Assessment for the Fort Collins 115kV Transmission Line
Upgrade Project (December 2001)
|
 |
DOE/EA-1356 |
Environmental
Assessment Proposed Changes to the Sanitary Biosolids
Land Application Program on the Oak Ridge Reservation
Oak Ridge, Tennessee (February 2003)
|
 |
DOE/EA-1357 |
Presidential
Permit PP-226, Brownsville Public Utilities Board
(August 2001)
|
 |
DOE/EA-1363 |
Joint
Environmental Assessment of the California Department
of Food and Agriculture Curly Top Virus Control Program
for the Bureau of Land Management and Department of
Energy (April 2002)
|
 |
DOE/EA-1367 |
White
Sturgeon Mitigation & Restoration in the Columbia
& Snake River Upstream from Bonneville Dam (April 2003)
|
 |
DOE/EA-1371 |
Integrated
Natural Resources Management Plan, Environmental Assessment,
and Finding of No Significant Impacts for Rock Creek
Reserve (May 2001)
|
 |
DOE/EA-1372 |
Idaho
National Engineering and Environmental Laboratory Wildland
Fire Management Environmental Assessment (April 2003)
|
 |
DOE/EA-1375 |
Environmental
Assessment for Construction and Operation of a New Office
Building and Related Structures at TA-3 within Los Alamos
National Laboratory (July 2001)
|
 |
DOE/EA-1376 |
Environmental
Assessment for Proposed Construction and Operation of
a New Interagency Emergency Operations Center at Los
Alamos National Laboratory (February 2003)
|
 |
DOE/EA-1378 |
Final
Site-Wide Environmental Assessment of National Renewable
Energy Laboratory's National Wind Technology Center
(May 2002)
|
 |
DOE/EA-1383 |
Amendment
of Presidential Permit (PP-68) San Diego Gas and Electric
Company for Interconnection of Otay Mesa Generating
Project to Miguel-Tijuana 230 kV Transmission Line San
Diego, California (October 2001)
|
 |
DOE/EA-1384 |
Environmental
Assessment Proposed Improvements at the Thomas Jefferson
National Accelerator Facility Newport News, Virginia
(June 2002)
|
 |
DOE/EA-1391 |
Environmental
Assessment for Presidential Permit Application for Baja
California Power, Inc., and Sempra Energy Resources
(December 2001)
|
 |
DOE/EA-1393 |
Programmatic
Environmental Assessment for the U. S. Department of
Energy, Oak Ridge Operations Implementation of a Comprehensive
Management Program for the Storage, Transportation,
and Disposition of Potentially Reusable Uranium Materials
(October 2002)
|
 |
DOE/EA-1394 |
Environmental
Assessment for Authorizing the Puerto Rico Electric
Power Authority (PREPA) to allow Public Access to the
Boiling Nuclear Superheat (BONUS) Reactor Building,
Ricon, Puerto Rico (January 2003)
|
 |
DOE/EA-1395 |
Final Environmental Assessment for
Right-of-Way Maintenance in the Sacramento Valley, California (August
2005)
(NOTE: Electronic files are not available due to sensitive content)
|
 |
DOE/EA-1396 |
Final
Environmental Assessment Small-Scale Geothermal Power
Plant and Direct-Use Geothermal Application at AmeriCulture
Inc., Cotton City, NM (August 2002)
|
 |
DOE/EA-1399 |
Environmental
Assessment of Ground Water Compliance at the Gunnison,
Colorado, UMTRA Project Site (July 2002)
|
 |
DOE/EA-1402 |
Environmental
Assessment for Methane Energy and Agricultural Development
Port of Tillamook Bay Dairy Digester Project, Tillamook
County, Oregon (January 2002)
|
 |
DOE/EA-1405 |
Environmental
Assessment for Transuranic Waste Retrieval from the
218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford
Site, Richland, Washington (March 2002)
|
 |
DOE/EA-1408 |
Proposed
Future Disposition of Certain Cerro Grande Fire, Flood
and Sediment Retention Structures at Los Alamos National
Laboratory, Los Alamos, NM (August 2002)
|
 |
DOE/EA-1409 |
Proposed
Issuance of an Easement to the Public Service Co. of
New Mexico for the Construction and Operation of an
12- inch Natural Gas Pipeline within Los Alamos National
Laboratory (July 2002)
|
 |
DOE/EA-1411
- Final EA; Errata;
FONSI |
Final
Environmental Assessment for the East Altamont Energy
Center Application for Certification (01-AFC-4) Alameda
County (September 2002)
|
 |
DOE/EA-1412 |
Environmental
Assessment Expansion of the Volpentest Hazardous Materials
Management and Emergency Response Training and Education
Center, Hanford Site, Richland, Washington (November 2002)
|
 |
DOE/EA-1414 |
Final
Environmental Assessment on the Implementation of the
Authorized Limits Process for Waste Acceptance at the
C-746-U Landfill Paducah Gaseous Diffusion Plant Paducah,
Kentucky (August 2002)
|
 |
DOE/EA-1415 |
Environmental Assessment
for the Proposed Conveyance of the American Museum of
Science and Energy and Associated Property, Parcel G,
and Parcel 279.01 (March 2007)
|
 |
DOE/EA-1416 |
Demonstration
of an Integrated Power Generation System for Coal Mine
Waste Methane Utilization, Environmental Assessment
(June 2002)
|
 |
DOE/EA-1418 |
Otter
Tail Power Company Advanced Hybrid Particulate Collector
Big Stone City, Grant County, South Dakota, Final Environmental
Assessment (June 2002)
|
 |
DOE/EA-1422 |
Final
Site-Wide Environmental Assessment (SWEA of the Sandia
National Laboratories/California (January 2003)
|
 |
DOE/EA-1426 |
Environmental
Assessment for the Linac Coherent Light Source Experimental
Facility at the Stanford Linear Accelerator Center,
Stanford, California (December 2002)
|
 |
DOE/EA-1429 |
Environmental
Assessment for Proposed Access Control and Traffic Improvements
at Los Alamos National Laboratory (August 2002)
|
 |
DOE/EA-1430 |
Environmental
Assessment for the Installation and Operation of Combustion
Turbine Generators at Los Alamos National Laboratory,
Los Alamos, New Mexico (December 2002)I Water Supply
(October 2002) |
 |
DOE/EA-1431 |
Environmental
Assessment for the Proposed Los Alamos National Laboratory
Trails Management Program, Los Alamos, New Mexico
(September 2003) |
 |
DOE/EA-1433 |
Decision
Notice and Environmental Assessment for Cooperative
Gypsy Moth Project (April 2002) |
 |
DOE/EA-1434 |
Environmental
Assessment for the Sunrise II Water Supply (October 2002) |
 |
DOE/EA-1437 |
Environmental
Assessment for the National Compact Stellarator Experiment
at the Princeton Plasma Physics Laboratory (September 2002) |
 |
DOE/EA-1438 |
Finding
of No Significant Impact and Final Environmental Assessment
for the Future Location of Heat Source/Radioisotope
Power System Assembly and Testing and Operations Currently
Located at the Mound Site (August 2002) |
 |
DOE/EA-1440 |
Final
Environmental of the National Renewable Energy Laboratory's
(NREL) South Table Mountain Complex (February 2003) |
 |
DOE/EA-1441 |
Final
Environmental Assessment for Construction and Operation
of the Molecular Foundry (February 2003) |
 |
DOE/EA-1442R |
Revised Final Environmental
Assessment for the Biosafety Level 3 Facility at Lawrence
Livermore National Laboratory (January 2008) |
 |
DOE/EA-1442 |
Environmental
Assessment for The Proposed Construction and Operation
of a Biosafety Level 3 Facility at Lawrence Livermore
National Laboratory (December 2002) |
 |
DOE/EA-1444 |
Construction
of New Office Building, Child-Care Facility, Parking
Garage, and Storm Water Retention Pond (September 2002) |
 |
DOE/EA-1445 |
Construction
of a Child-Care Facility (September 2002) |
 |
DOE/EA-1446 |
Final
Environmental Assessment for the Test Capabilities Revitalization
at Sandia National Laboratories/New Mexico (January 2003) |
 |
DOE/EA-1447 |
Final
Environmental Assessment for the Proposed Consolidation
of Certain Dynamic Experimentation Activities at the
Two-Mile Mesa Complex Los Alamos National Laboratory,
Los Alamos, New Mexico (November 2003) |
 |
DOE/EA-1449 |
Commercial
Demonstration of the Manufactured Aggregate Processing
Technology Utilizing Spray Dryer Ash, King George County,
Virginia (August 2002) |
 |
DOE/EA-1451 |
Environmental
Assessment for the Leasing of Facilities and Equipment
to USEC Inc. (October 2002) |
 |
DOE/EA-1452 |
Environmental
Assessment of Ground Water Compliance at the Durango,
Colorado, UMTRA Project Site (November 2002) |
 |
DOE/EA-1454 |
Environmental
Assessment Reactivation and Use of Three Former Borrow
Sites in the 100-F, 100-H, and 100-N Areas (March 2003) |
 |
DOE/EA-1455 |
Environmental
Assessment for Enhanced Operations of the Advanced Photon
Source at Argonne National Laboratory-East, Argonne,
Illinois (June 2003) |
 |
DOE/EA-1456 |
Final Environmental
Assessment for the Cheyenne-Miracle Mile and
Ault-Cheyenne Transmission Line Rebuild Project
(October 2006) |
 |
DOE/EA-1457 |
Environmental
Assessment for the Center for Integrated Nanotechnologies
at Sandia National Laboratories/New Mexico (March 2003) |
 |
DOE/EA-1458 |
Final
Environmental Assessment of Ground Water Compliance
at the Slick Rock, Colorado, UMTRA Project Site
(February 2003) |
 |
DOE/EA-1460 |
I'SOT
Canby District Heating Project, Modoc County, California
Final Environmental Assessment (March 2003) |
 |
DOE/EA-1462 |
Environmental
Assessment for the Accelerated Tank Closure Demonstration
Project (June 2003) |
 |
DOE/EA-1463 |
Environmental Assessment for Interim Rule, 10 CFR 433, Energy
Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings and 10 CFR 435, Energy
Efficiency Standards for New Federal Residential Low-Rise Residential Buildings (November 2007) |
 |
DOE/EA-1464 |
Environmental
Assessment for Proposed Corrective Measures at Material
Disposal Area H within Technical Area 54 at Los Alamos
National Laboratory, Los Alamos, New Mexico (June 2004) |
 |
DOE/EA-1465 |
Environmental
Assessment Wind Energy Center Edgeley/Kulm Project,
North Dakota (April 2003) |
 |
DOE/EA-1466 |
Environmental
Assessment of Ground Water Compliance at the Naturita,
Colorado, UMTRA Project Site (April 2003) |
 |
DOE/EA-1467 |
Final
Environmental Assessment and Finding of No Significant
Impact Bonneville-Alcoa Access Road Project (February 2004) |
 |
DOE/EA-1470 |
Harry
Allen-Mead 500 kV Transmission Line Project Environmental
Assessment (October 2004) |
 |
DOE/EA-1472 |
Environmental
Assessment for the Commercial Demonstration of the Low
NOx Burner/Separated Over-Fire Air (LNB/SOFA) Integration
System Emission Reduction Technology, Finney County,
Kansas (March 2003) |
 |
DOE/EA-1473 |
Environmental
Assessment for the Partial Funding of a Proposed Life
Sciences Building at Brown University, Providence, Rhode
Island (July 2003) |
 |
DOE/EA-1475 |
Chariton
Valley Biomass Project Final Environmental Assessment
and Finding of No Significant Impact (July 2003) |
 |
DOE/EA-1476 |
Environmental
Assessment for Toxecon Retrofit for Mercury and Multi-Pollutant
Control, Presque Isle Power Plant, Marquette, Michigan
(September 2003) |
 |
DOE/EA-1477 |
Environmental
Assessment for Lignite Fuel Enhancement Project, Coal
Creek Station, Great River Energy, Underwood, North
Dakota (November 2003) |
 |
DOE/EA-1478 |
Hoover
Dam Bypass Project Phase II Environmental Assessment
(October 2003) |
 |
DOE/EA-1482 |
Environmental
Assessment for Pilot Experiment for Geological Sequestration
of Carbon Dioxide in Saline Aquifer Brine Formations,
Frio FOrmation, Liberty County, Texas (October 2003) |
 |
DOE/EA-1483 |
Environmental
Assessment for Decontamination and Decommissioning of
the Juggernaut Reactor at Argonne National Laboratory
– East Argonne, Illinois (March 2004) |
 |
DOE/EA-1485 |
Environmental
Assessment for the Nisqually Transmission Line Relocation
Project (January 2005) |
 |
DOE/EA-1486 |
Final
Environmental Assessment Methow Valley Irrigation District
Project East and West Diversion Screening Proposal
(March 2004) |
 |
DOE/EA-1488 |
Environmental
Assessment for the U-233 Disposition, Medical Isotope
Production, and Building 3019 Complex Shutdown at the
Oak Ridge National Laboratory (December 2004) |
 |
DOE/EA-1489 |
Environmental
Assessment for the Construction and Operation of the Howard T. Ricketts
Laboratory (January 2006) |
 |
DOE/EA-1490 |
Environmental Assessment for the Sharyland
Utilities, L.P. Proposed 138-kV DC Mexico Tie Project Hidalgo County, TX (August 2004) |
 |
DOE/EA-1492 |
Environmental
Assessment and Finding of No Significant Impact for
the Rocky Flats Environmental Technology Site Pool and
Land Configuration (October 2004) |
 |
DOE/EA-1493 |
Environmental
Assessment for Greenidge Multi-Pollutant Control Project
(August 2004) |
 |
DOE/EA-1494 |
Final
Environmental Assessment for Activities Using Biological
Simulants and Releases of Chemicals at the Nevada Test
Site (June 2004) |
 |
DOE/EA-1495 |
Environmental
Assessment and Finding of No Significant Impact of the
USEC Inc. American Centrifuge Lead Cascade Facility
at Piketon, Ohio (January 2004) |
 |
DOE/EA-1498 |
Environmental
Assessment for the Advanced Coal Utilization Byproduct
Beneficiation Processing Plant Ghent Power Station,
Carroll County, Kentucky (January 2005) |
 |
DOE/EA-1499 |
Radiological/Nuclear
Countermeasures Test and Evaluation Complex, Nevada
Test Site Final Environmental Assessment (August
2004) |
 |
DOE/EA-1501 |
Environmental
Assessment for the Construction, Operation, and Closure
of the Burma Road II Borrow Pit at the Savannah River
Site (July 2004) |
 |
DOE/EA-1503 |
Environmental
Assessment, Vermont Electric Power Company Proposed
Northern Loop Project (October 2004) |
 |
DOE/EA-1505 |
Environmental
Assessment for the Proposed Increase in the Facility
Capacity and Petroleum Inventory at the Strategic Petroleum
Reserve's Bryan Mound Storage Facility, Texas (November
2004) |
 |
DOE/EA-1506 |
Final
Environmental Assessment for Thermal Conversion Process
(TCP) Technology (December 2004) |
 |
DOE/EA-1508 |
Environmental
Assessment for the Beaver Creek-Hoyt-Erie Transmission
Line Rebuild Project (November 2005) |
 |
DOE/EA-1510 |
Final
Environmental Assessment for the Alternate Financed
Facility Modernization (January 2005) |
 |
DOE/EA-1513 |
Environmental
Assessment for the National Pollutant Discharge Elimination
System (NPDES) Wastewater Permit Compliance Alternatives
at the Savannah River Site (April 2005) |
 |
DOE/EA-1514 |
Environmental Assessment, U.S. Department of Energy, Conveyance of Parcel ED-6 to the City of Oak Ridge, Tennessee
(May 2007) |
 |
DOE/EA-1515 |
Final
Environmental Assessment for Proposed Closure of the
Airport Landfills Within Technical Area 73 at Los Alamos
National Laboratory, Los Alamos, New Mexico (May
2005) |
 |
DOE/EA-1516 |
Environmental
Assessment for the Proposed Clipper Windpower, Inc.
Low Wind Speed Turbine Demonstration Project, Carbon
County, Wyoming (January 2005) |
 |
DOE/EA-1517 |
Environmental
Assessment for the Design and Construction of a Fuel
Ethanol Plant, Jasper County, Indiana (April 2005) |
 |
DOE/EA-1518 |
Environmental
Assessment of the Kootenai River Ecosystem Project
(June 2005) |
 |
DOE/EA-1519 |
Environmental
Assessment for the Proposed Decontamination and Decommissioning
of the Zero Power Reactors (Building 315) at Argonne
National Laboratory (April 2005) |
 |
DOE/EA-1521 |
Environmental
Assessment for Spring Canyon Wind Project, Logan County,
Colorado (June 2005) |
 |
DOE/EA-1523 |
Environmental Assessment to Address Proposed Site Modifications at
the Strategic Petroleum Reserve's West Hackberry Raw
Water Intake Structure Site, Parish, Louisiana (November
2005) |
 |
DOE/EA-1527 |
Environmental Assessment and Corrective
Measures Study Report for Remediating Contamination at Lawrence Berkeley
National Laboratory Regulated under the Resource Conservation
and Recovery Act (September 2005) |
 |
DOE/EA-1528 |
Environmental
Assessment for the Storage of Tritium-Producing Burnable
Absorber Rods in K-Area Transfer Bay at the Savannah
River Site (June 2005) |
 |
DOE/EA-1530 |
Environmental Assessment for Proposed Energy
Conservation Standards for Residential Furnaces and Boilers (September 2007) |
 |
DOE/EA-1532 |
Final Environmental Assessment
for the Proposed Consolidation of Neutron Generator Tritium Target
Loading Production (June 2005) |
 |
DOE/EA-1533 |
Environmental
Assessment for the Proposed Gas Main and Distribution
System Upgrade for Pantex Plant, Amarillo, Texas
(August 2005) |
 |
DOE/EA-1534 |
Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan
(January 2007) |
 |
DOE/EA-1535 |
Uranium Leasing Program Final Programmatic Environmental Assessment
(July 2007) |
 |
DOE/EA-1538 |
Environmental
Assessment for the Safeguards and Security Upgrades
for Storage of Plutonium Materials at the Savannah River
Site (SRS) (December 2005) |
 |
DOE/EA-1541 |
Demolition of Building 51
and the Bevatron at Lawrence Berkeley National Laboratory (March 2008) |
 |
DOE/EA-1542 |
Final
Environmental Assessment for the Burleigh County Wind
Center (August 2005) |
 |
DOE/EA-1544 |
Environmental Assessment for the Proposed
Anadarko/Veritas Salt Creek 3D Vibroseis Project (June 2005) |
 |
DOE/EA-1545 |
Environmental Assessment for the Proposed Withdrawal
of Public Lands Within and Surrounding the Caliente
Rail Corridor, Nevada (December 2005) |
 |
DOE/EA-1546 |
Environmental
Assessment for the LNG from Coal Mine Methane for Industrial
and Transportation Applications (February 2006) |
 |
DOE/EA-1547F |
Environmental
Assessment for the Sodium Residual Reaction/Removal and Other
Deactivation Work Activities, Fast Flux Test Facility Project, Hanford
Site, Richland, Washington (March 2006) |
 |
DOE/EA-1548 |
Finding of No Significant Impact and
Final Environmental Assessment for the Y-12 Potable Water System
Upgrade (March 2006) |
 |
DOE/EA-1552 |
Environmental Assessment for
the Decontamination, Demolition, and Removal of Certain
Facilities at West Valley Demonstration Project
(September 2006) |
 |
DOE/EA-1555 |
Environmental Assessment
for the Proposed Consolidation and Expansion of Idaho
National Laboratory Reseach and Development at a
Science and Technology Campus
(March 2007) |
 |
DOE/EA-1557 |
Environmental Assessment
for the National Security Test Range
(April 2007) |
 |
DOE/EA-1558 |
Environmental Assessment for the National
Synchroton Light Source II at Brookhaven National Laboratory
(September 2006) |
 |
DOE/EA-1562 |
Environmental Assessment for the Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (January 2007) |
 |
DOE/EA-1563 |
Environmental Assessment for the National Pollutant Discharge Elimination System Stormwater Compliance Alternatives at the Savannah River Site (June 2007) |
 |
DOE/EA-1565 |
Environmental Assessment for Adopted
Energy Conservation Standards for Distribution Transformers
(July 2007) |
 |
DOE/EA-1568 |
Environmental Assessment for
the Replacement Source of Steam for A Area at the Savannah
River Site (October 2006) |
 |
DOE/EA-1569 |
Environmental Assessment for the
Environmental Remediation of Lawrence Livermore National Laboratory
at Site 300 Pit 7 Complex (January 2007) |
 |
DOE/EA-1571 |
Environmental Assessment
for The Ohio State University, Ohio 4-H center with Green Building
Technologies (December 2006) |
 |
DOE/EA-1573 |
Finding of No Significant
Impact and Final Environmental Assessment of Three Site Development
Projects at the National Renewable Energy Laboratory South Table
Mountain Site (July 2007) |
 |
DOE/EA-1574 |
Environmental Assessment for U-233
Stabilization, and Building 3019 Complex Shutdown at the Oak Ridge
National Laboratory Oak Ridge, Tennessee (March 2007) |
 |
DOE/EA-1575 |
Environmental Assessment for the
Oak Ridge Science and Technology Project at the Oak Ridge National
Laboratory, Oak Ridge, Tennessee (February 2008) |
 |
DOE/EA-1576 |
Olympia Peninsula Transmission Line Reinforcement Project (March 2008) |
 |
DOE/EA-1579 |
Environmental Assessment for
Proposed Perched Groundwater Corrective Measures (July
2007) |
 |
DOE/EA-1585 |
Environmental Assessment for the
Proposed Decontamination and Demolition of Building 301 at Argonne
(March 2007) |
 |
DOE/EA-1588 |
Sacramento Municipal Utility District
Final Environmental Assessment (January 2007) |
 |
DOE/EA-1592 |
Environmental Assessment for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant (April 2008) |
 |
DOE/EA-1593 |
Final Environmental Assessment for the
Y-12 Steam Plant Life Extension Project - Steam Plant Replacement
Subproject (August 2007) |
 |
DOE/EA-1597 |
Final Environmental Assessment for Construction and
Operation of a Proposed Ethanol Cellulosic Ethanol Plant, Range Fuels, Inc. (October 2007) |